UPDATE: NOVEMBER 2018
This project was completed in either late October or early November after Malsvir instructed us about leveling dirt that is higher than a flat tile.
Basically, he one-handily supercharged this project by instructing us how “not to dig”, but rather, “to level”. It was an eye-opener, nonetheless!
Here are the results:
NEW: SEPTEMBER 2018
After expanding the village, we have a new area where newbies can build Body Strength, by digging the area on the right, until it’s flat, like the area on the left.